The collection area along the left side of the green on #6 Black Bird has always been too wet, due mostly to surface runoff from the cart path and surrounding tee complex. In the hopes of firming this area up, we installed some drain tile and a 12" catch basin in order get the water underground and away from the area more efficiently.
Trench excavation
Plywood allows us to save as much turf as possible.
Prepping for pipe and gravel install.
New basin to catch water on the cartpath.
Backfilling and grading is complete and the area is ready for seed.