Thursday, August 30, 2012

Course and Construction Update

We were fortunate to catch some cool weather and rain last week which has really helped the course. The over-seeding process began last week and most of Red Feather and Black Bird fairways are complete. We have really started to see some good germination in these fairways. This process will be put on hold temporarily as we gear up for aerification next week.
 
Our aerification process will be very similar to the one we used this past spring.We will again be pulling 5/8" cores on the greens and 1/2" cores in the fairways and collection areas. In addition, we will core all the tee surfaces this fall. This is something that hasn't been done since I started at Indian Creek.
 
Construction is going well and deadlines are being met. All of the greens were seeded earlier this week and the sodding of the greens complexes will be complete by the end of day on Friday. Once the green complexes are sodded, we can really start throwing water to the greens. Gray Hawk is slowly shaping into a great golf course. I firmly believe we saved our best for last.
 
All in all, it appears we have survived the summer and are well into the recovery period. For now, let's hope for cooler weather and additional rain. Take a look at some pictures of the construction process below. I hope you all enjoy your Labor Day weekend. Football season is here - GBR!!! 
 
Sodding green side bunker on #7 Gray Hawk
 
Seeding collection area on the back of the green on #5 Gray Hawk.
 
#2 Gray Hawk green complex after sod and seed.
 
Installing a riser to match irrigation head with new grade.
 
#4 Gray Hawk green complex after sod and seed.

Monday, August 27, 2012

Gray Hawk Construction Update

 
Below are a few pictures of some greens complexes prior to sod installation. Greens were seeded today and we hope to have all of the greens complexes sodded by this weekend.
 
#1
 
 #2

#3

#4

#6
 

 #8

Saturday, August 25, 2012

Cart Path

Due to the rainfall we have received and are expecting the rest of the day, the course will have cart path restrictions in place.

Thursday, August 23, 2012

Irrigation Installation

 
A few pictures of the irrigation installation on the upper practice putting green.
 
 
The trailer containing all the signal and common wire for the upper putting green.
 
 
Wire pull
 
 
 Pipe and wire after pull and ready for head install.

 
Connecting signal and common wire and preparing for the install of the swing joint and head.

 
Installing the swing joint, head, and quick coupler.

#3 Gray Hawk Construction

 
 We built two new bunkers on what was the upper left shelf of the old fairway. We also graded and softened the slope that used to split the old fairway. This will really tighten up the landing area off the tee by taking away the option to bail out to the left.


 
We rebuilt both greenside bunkers and have created low mow collection areas around both sides of the green. We also built a 1200 square foot expansion onto the back left of the green. This expansion has created a very difficult pin location when tucked behind the new bunker. This will be a great hole.

Thursday, August 16, 2012

Cart Path Rule Removed

We removed the cart path restrictions on Tuesday and will adhere to the 90 degree rule for the time being. It is my hope that this can be permanent but until we get a good rain, it will be a day-to-day decision.

Everyone has been extremely patient the last few weeks and we appreciate it immensely.

#2 Gray Hawk Greens Surround Construction


This picture illustrates the changes we have made to the greens complex on #2 Gray Hawk. We shifted the outside bunkers further out to allow room for the fairway to run up to the green on both sides of the center bunker. The center bunker makes reaching the green in two much more challenging.